Employee Webmail

Guildner Pipeline Maintenance, Inc.


VALUE ENGINEERING ANALYSIS - COST PER YEAR OF LIFE
cost comparison graphic
Analysis based on typical manhole of average depth with infiltration and deterioration problems. While Poly-Triplex Liners are suitable for both horizontal and vertical structures in sewer and stormwater collection systems, Some of these rehab methods are not suitable for horizontal lining of concrete and corrugated metal culvert pipe.
Poly-Triplex Spray-on Epoxy Cementitious Urethane Coating Liners w/o Membrane PVC Liner w/ Concrete
Product Life Expectancy (Years) 50 3 2 5 5 10
10-Year Waranty? Yes No No No No No
Effective in Freeze/thaw Conditions? Yes No No Yes Yes Yes
Chemical Resistance Excellent Good Fair Good Good Good
Structural Enhancement Excellent Poor Good Good fair Excellent
Ability to Pass Vacuum Test Excellent Poor Poor Poor Fair Good
Poduct Materials Cost $3,500 $1,200 $750 $3,000 $3,300 $4,900
Installation Cost* $550 $1,480 $900 $630 $825 $1,975
Total Cost Per Year of Life** $81 893$ $825 $726 $825 $688
*Assumes a certin number of manhours at prevailing wages. **Product cost plus installation cost divided by product life.

All information provided by Poly-Triplex® Technologies.

 

[Home] [Services] [About Us] [Contact Us] [Links]


© 2006 Guildner Pipeline Maintenance, Inc.